HVAC Permits for ZIP Code 54150

Complete HVAC permit guide for contractors working in ZIP code 54150,Menominee, Menominee County. Get forms, requirements, and compliance information.

ZIP Code 54150

Menominee, Menominee County, WI

Climate Zone:6A
Energy Code:2021 IECC
Manual J Required:Check with dept.
REScheck Required:Yes
0
Permit Forms
2021 IECC
Energy Standard
6A
Climate Zone
Menominee County
County

Need Manual J Load Calculations for ZIP 54150?

Get professional load calculations that meet Menominee building department requirements. Climate Zone 6A parameters included.

Get Your Free Load Calculation

Required HVAC Permit Forms

Official permit applications required for HVAC work in ZIP code 54150. Submit through Menominee building department.

Energy Code Compliance for ZIP 54150

Specific energy efficiency requirements and documentation needed for HVAC installations in Climate Zone 6A.

Compliance Requirements

Manual J Load Calculation

Check with Department

Required for proper system sizingRecommended for optimal system sizing and performance

REScheck Energy Analysis

Required

Building envelope compliance verification

Equipment Efficiency Documentation

Required

SEER/HSPF ratings and ENERGY STAR certification

Duct Design Calculations

Required

Manual D duct sizing and layout plans

Climate Zone 6A Specifications

Zone 6A

IECC Climate Classification

Climate Zone 6A requirements affect equipment efficiency standards, insulation values, and system design parameters for optimal performance.

Energy Code: 2021 IECC

Location: Menominee, Menominee County

View Full Climate Zone Data

Need Professional Load Calculations?

Ensure your HVAC system meets all code requirements in ZIP 54150

✅ Manual J load calculation
✅ Equipment sizing recommendations
✅ Energy code compliance verification
✅ Professional report ready for permits
Get Your FREE Load Calculation Report

Upload your blueprint and get results in 5 minutes • Used by 10,000+ contractors

Other ZIP Codes in Menominee

All ZIP codes in Menominee follow the same permit requirements and energy code standards.