HVAC Permits in Memphis, TN

Complete guide to HVAC permit requirements, forms, and energy code compliance for contractors working in Memphis, Shelby County.

25
ZIP Codes
1
Permit Forms
3A
Climate Zone
2021 IECC
Energy Code

HVAC Permit Forms for Memphis

Official permit applications and building department portals for HVAC contractors in Memphis, Shelby County.

Shelby County Building Permits - Develp901 Portal

Accela Citizen Access portal for mechanical permits in Memphis/Shelby County

mechanical permit
Access Form Portal

Energy Code Requirements

Compliance standards and documentation requirements for HVAC installations in Memphis.

Current Standards

2021 IECC

Energy Code Standard

Current energy efficiency requirements for HVAC systems in Memphis, including equipment ratings and building envelope standards.

Required Documentation

Manual J Load CalculationCheck with Department

Recommended for optimal system sizing and performance

REScheck ComplianceRequired
Equipment Efficiency SpecsRequired
Duct Design PlansRequired

ZIP Codes Covered in Memphis

All ZIP codes where these permit requirements apply. Select a specific ZIP for detailed information.

Need Professional Load Calculations?

Ensure your HVAC system meets all code requirements in Memphis, TN

✅ Manual J load calculation
✅ Equipment sizing recommendations
✅ Energy code compliance verification
✅ Professional report ready for permits
Get Your FREE Load Calculation Report

Upload your blueprint and get results in 5 minutes • Used by 10,000+ contractors

Frequently Asked Questions

Common questions about HVAC permits and energy code compliance in Memphis, TN

1What permits do I need for HVAC work in Memphis?

Memphis requires mechanical permits for most HVAC installations and replacements. You'll need to submit applications through the building department portal and ensure compliance with 2021 IECC energy standards.

2Are Manual J calculations required in Memphis?

Manual J calculations may be required depending on the scope of work in Memphis. Check with the building department for specific requirements.

3What climate zone is Memphis in?

Memphis is located in Climate Zone 3A. This affects equipment efficiency requirements and design parameters for HVAC systems.

4How long does permit processing take in Memphis?

Permit processing times in Memphis typically range from 1-3 weeks, depending on the complexity of the project and completeness of your application. Having all required documentation upfront can speed up the process.