HVAC Permits in Los Angeles, CA
Complete guide to HVAC permit requirements, forms, and energy code compliance for contractors working in Los Angeles, Los Angeles County.
HVAC Permit Forms for Los Angeles
Official permit applications and building department portals for HVAC contractors in Los Angeles, Los Angeles County.
Los Angeles HVAC Mechanical Permits
City of Los Angeles HVAC mechanical permit applications for contractors
LA County HVAC Express Permits
Los Angeles County HVAC mechanical permit system for contractors
Energy Code Requirements
Compliance standards and documentation requirements for HVAC installations in Los Angeles.
Current Standards
2022 Title 24
Energy Code Standard
Current energy efficiency requirements for HVAC systems in Los Angeles, including equipment ratings and building envelope standards.
Required Documentation
ZIP Codes Covered in Los Angeles
All ZIP codes where these permit requirements apply. Select a specific ZIP for detailed information.
Need Professional Load Calculations?
Ensure your HVAC system meets all code requirements in Los Angeles, CA
Upload your blueprint and get results in 5 minutes • Used by 10,000+ contractors
Frequently Asked Questions
Common questions about HVAC permits and energy code compliance in Los Angeles, CA
1What permits do I need for HVAC work in Los Angeles?
Los Angeles requires mechanical permits for most HVAC installations and replacements. You'll need to submit applications through the building department portal and ensure compliance with 2022 Title 24 energy standards.
2Are Manual J calculations required in Los Angeles?
Yes, Manual J load calculations are required for HVAC permits in Los Angeles. Our free load calculation tool can generate the professional reports you need.
3What climate zone is Los Angeles in?
Los Angeles is located in Climate Zone 3B. This affects equipment efficiency requirements and design parameters for HVAC systems.
4How long does permit processing take in Los Angeles?
Permit processing times in Los Angeles typically range from 1-3 weeks, depending on the complexity of the project and completeness of your application. Having all required documentation upfront can speed up the process.