HVAC Permits in Albuquerque, NM

Complete guide to HVAC permit requirements, forms, and energy code compliance for contractors working in Albuquerque, Bernalillo County.

42
ZIP Codes
2
Permit Forms
4B
Climate Zone
2021 IECC
Energy Code

HVAC Permit Forms for Albuquerque

Official permit applications and building department portals for HVAC contractors in Albuquerque, Bernalillo County.

ABQ-PLAN Permit Portal

City of Albuquerque comprehensive permit portal for all building and mechanical permits including HVAC systems

building permit
Access Form Portal

Albuquerque Mechanical Permits

City of Albuquerque Planning Department HVAC and mechanical permit applications for contractors

mechanical permit
Access Form Portal

Energy Code Requirements

Compliance standards and documentation requirements for HVAC installations in Albuquerque.

Current Standards

2021 IECC

Energy Code Standard

Current energy efficiency requirements for HVAC systems in Albuquerque, including equipment ratings and building envelope standards.

Required Documentation

Manual J Load CalculationCheck with Department

Recommended for optimal system sizing and performance

REScheck ComplianceRequired
Equipment Efficiency SpecsRequired
Duct Design PlansRequired

Need Professional Load Calculations?

Ensure your HVAC system meets all code requirements in Albuquerque, NM

✅ Manual J load calculation
✅ Equipment sizing recommendations
✅ Energy code compliance verification
✅ Professional report ready for permits
Get Your FREE Load Calculation Report

Upload your blueprint and get results in 5 minutes • Used by 10,000+ contractors

Frequently Asked Questions

Common questions about HVAC permits and energy code compliance in Albuquerque, NM

1What permits do I need for HVAC work in Albuquerque?

Albuquerque requires mechanical permits for most HVAC installations and replacements. You'll need to submit applications through the building department portal and ensure compliance with 2021 IECC energy standards.

2Are Manual J calculations required in Albuquerque?

Manual J calculations may be required depending on the scope of work in Albuquerque. Check with the building department for specific requirements.

3What climate zone is Albuquerque in?

Albuquerque is located in Climate Zone 4B. This affects equipment efficiency requirements and design parameters for HVAC systems.

4How long does permit processing take in Albuquerque?

Permit processing times in Albuquerque typically range from 1-3 weeks, depending on the complexity of the project and completeness of your application. Having all required documentation upfront can speed up the process.