DC

Manual J Requirements in District of Columbia

Is Manual J required in District of Columbia?

YESDistrict of Columbia has adopted 2021 IECC which requires HVAC loads be calculated per ACCA Manual J for new construction and major renovations.

Energy Code
2021 IECC
Climate Zones
4A
Major Cities
Washington DC
Get Your Free District of Columbia Manual J

District of Columbia Energy Code & Manual J

Current Adopted Code

District of Columbia has adopted 2021 IECC as the statewide energy code for residential construction.

HVAC sizing per ACCA Manual J
Duct design per ACCA Manual D
Equipment selection per ACCA Manual S

What District of Columbia Building Departments Require

  • Manual J load calculation report
  • Equipment sizing documentation
  • Professional-quality PDF format
  • Climate zone and design temp data

District of Columbia Climate Zones & Design Temperatures

IECC Climate Zone
4A

Covers the entire state including Washington DC

Manual J Requirements by District of Columbia City

Washington DC
Zone 4A

How to Get a Manual J Calculation in District of Columbia

RECOMMENDED

AutoHVAC (FREE First Report)

  • Upload your District of Columbia blueprint
  • AI extracts all building data
  • Get permit-ready report in 60 seconds
  • No credit card required
Get Free District of Columbia Manual J →

Local District of Columbia Contractors

  • Turnaround: 3-7 days
  • $Typical cost: $150-400
  • On-site visit possible
  • Local expertise

DIY Software

  • Time: 30+ minutes per calc
  • $Cost: $5-200+/month
  • CoolCalc, Wrightsoft, etc.
  • Requires manual data entry

District of Columbia Manual J FAQ

How much does a Manual J calculation cost in District of Columbia?

Local District of Columbia contractors typically charge $150-400 for Manual J calculations. AutoHVAC offers your first Manual J calculation completely FREE with permit-ready results in 60 seconds — no credit card required.

Is a Manual J calculation required in District of Columbia?

Yes. District of Columbia follows 2021 IECC which requires heating and cooling loads be calculated per ACCA Manual J for permits on new construction and major HVAC work.

Where can I get a Manual J calculation in District of Columbia?

You can get a free Manual J calculation for District of Columbia instantly at AutoHVAC — upload your blueprint and receive a permit-ready report in 60 seconds. Alternatively, local District of Columbia HVAC contractors charge $150-400 with 3-7 day turnaround, or you can use DIY software like Wrightsoft or CoolCalc ($5-200+/month).

What climate zone is District of Columbia in for Manual J?

District of Columbia includes IECC climate zone 4A. This zone covers the entire state including Washington DC. Climate zone data determines design temperatures and insulation requirements used in Manual J calculations.

Get Your Free District of Columbia Manual J Calculation

Join thousands of District of Columbia contractors who use AutoHVAC for instant, permit-ready load calculations.

Get Free District of Columbia Manual J

No credit card required • Results in 60 seconds