What Climate Zone is McLeod, Minnesota?

McLeod is in IECC Climate Zone 6A (Cold - Humid). Get accurate Manual J load calculations with official design temperatures for McLeod.

Climate Zone
6A
Winter Design
-9°F
Summer Design
89°F
ZIP Codes
8

McLeod, Minnesota falls within IECC Climate Zone 6A (Cold - Humid), a heating-dominated region with humid moisture conditions. HVAC contractors working in McLeod must use the official ASHRAE design temperatures of -9°F (99% winter) and 89°F (1% summer) when performing Manual J load calculations. These values represent the outdoor conditions your heating and cooling system must handle 99% and 1% of the year, respectively — ensuring proper equipment sizing without costly over- or under-sizing.

Because Zone 6A is heating-dominated, insulation levels are critical. McLeod homes require a minimum of R-20 wall insulation, R-49 ceiling insulation, and windows with a U-factor of 0.3 or lower per the IECC 2021 energy code.

McLeod Insulation Requirements (IECC 2021)

Minimum insulation R-values and window performance requirements for Climate Zone 6A in McLeod, Minnesota.

Building ComponentMinimum RequirementUnit
Ceiling / Attic InsulationR-49R-value
Wall InsulationR-20R-value
Floor InsulationR-30R-value
Window U-Factor0.3BTU/hr-ft²-°F
Window SHGC0.4Coefficient
Air Infiltration0.15ACH50

McLeod HVAC Contractors: Get Your Free Manual J Report

Climate Zone 6A requires precise load calculations. Upload your McLeod blueprint and get a professional Manual J report in 60 seconds— first report is FREE. Pre-loaded with McLeod's exact design temperatures (-9°F winter / 89°F summer).

Claim Free Report
No credit card required

Verify Your McLeod ZIP Code

Enter your ZIP code to confirm it's in McLeod and get climate zone details.

McLeod covers 8 ZIP codes: 55312, 55336, 55350, 55354, 55370, 55381, 55385, 55395

McLeod Design Temperatures

Official ASHRAE design temperatures for McLeod, used for accurate Manual J load calculations.

Winter 99% Design Temp
-9°F
Summer 1% Design Temp
89°F
Summer Wet Bulb
73°F

IECC Requirements for Zone 6A

Minimum insulation and window requirements for McLeod per IECC 2021.

Wall Insulation:R-20
Roof/Ceiling:R-49
Floor Insulation:R-30
Window U-Factor:0.3
Window SHGC:0.4

Energy Code: 2020 IECC

Recommended HVAC Equipment for McLeod

Heating Systems

Gas furnace (96%+ AFUE)
Boiler
Cold climate heat pump
Typical AFUE
96-98%

Cooling Systems

AC (13-15 SEER)
Typical SEER
13-15 SEER

Get Free Manual J Calculations for McLeod

Upload your McLeod blueprint and get a professional Manual J load calculation using official Zone 6A design temperatures. First report is FREE.

McLeod design temps
Zone 6A compliant
Ready in 60 seconds
Upload Blueprint - Get Free Report

Join 10,000+ McLeod contractors who trust AutoHVAC